Design/Build Process

  • Have us pick up a plan or bring us a plan and we will work with the Professional Engineering Team at Monroe Equipment to design the right HVAC system for your new commercial building
  • We will generate a written “Base System Design” quote and offer a number of system upgrades to consider as well
  • Upon acceptance of our quote, we will:
  • 1. Complete all contract paperwork with your firm
    2. Generate a Schedule of Values for the project
    3. Supply proof of insurance for our company
    4. Supply a copy of our Safety Plan
    5. Submit a copy of “marked-up” drawings along with specifications to our engineering group so they can complete the HVAC Engineering drawings and submit the design for State Approval
    6. Assist you with getting local HVAC permits OR acquire the permits for you (whichever you prefer)
    7. Contact the local gas utility and coordinate sizing and pressure ratings for the gas service. We will work with you and the utility to facilitate proper placement of the gas service on the property

  • We will have all necessary equipment and materials in inventory and schedule our installation work to complete the project as efficiently as possible
  • We will properly start-up all equipment and air balance the system – with documentation – before the final inspection
  • We are proud of the fact that we have one of the lowest change order rates in the area which means you can have a higher confidence level that our initial proposal is complete
  • Our Commercial General Contractors never need to worry about missing a deadline due to the HVAC when working with Action
  • We also have an extremely low occurrence of punch list items from our commercial work. This holds down costs and raises customer satisfaction for your business

Bid Process

  • If you have a bid project, we will be happy to review the design and provide a quote for installing your Engineer’s HVAC design.

Examples of Commercial Projects

  • McDonald’s Restaurant in Pulaski
  • Mead & Hunt Office Addition in Green Bay
  • New Life Fellowship Church in De Pere
  • Smet Investments Office Build Out in Appleton
  • Smet Investments Contractor Condos in De Pere
  • Wisconsin Wireless in Little Chute
  • Vagabond Shoes in Grand Chute (Commercial Build Out)
  • Scray Quick Lube in De Pere
  • Ambrosius Studios addition in Green Bay
  • The Swan Club in De Pere
  • Square D Renovation in Greenville
  • Taco Johns in Bellevue
  • Henri’s Music Renovations in Green Bay
  • Home Interiors in Sheboygan
  • Parker Brothers Building in Pulaski
  • Sherwin Williams in Beaver Dam
  • Simon Insurance in Bellevue
  • Taco Johns in Suamico
  • Orion Energy Systems in Manitowoc
  • Subway in Wittenberg

Let’s Get Started

  • Experience a new level of response to customers and service! Give Action Heating a call today.